1D ⢠MYX
8 Oct, 04:36 am
151.5 KB

When most investors hear 'construction company', they picture road builders or property developers. JTGROUP is something fundamentally different - it is a power infrastructure engineering specialist that has positioned itself as the backbone of Malaysia's data centre mega-boom in Johor.
Every data centre that Microsoft, Google, AWS, and Nvidia is building in Johor requires a dedicated 275kV high-voltage TNB grid connection. The company installing those underground cables and substations? That is JTGROUP.
JTGROUP listed on Bursa Malaysia's ACE Market on December 20, 2023 at an IPO price of RM0.27, attracting 16.11x subscription - a strong early signal of market interest. All operations are conducted through its wholly-owned subsidiary, JT High Span Sdn Bhd (JTHSB).
| Segment | Revenue Contribution (Q4 FY2025) | Description |
|---|---|---|
| Underground & Overhead Utilities Engineering | 98.46% | 275kV HV cables, substations, distribution systems |
| Street Lighting | ~1.5% | TNB/local authority street lighting projects |
| Other (Roflex Pipe - new) | - | Polyethylene pipes, integrated March 2026 |
This is a compelling transformation story. In FY2024, approximately 20% of JTGROUP's order book came from data centre-related projects. By January 2026, that figure had surged to approximately 50% of a RM733M order book.
Key contracts secured:
As of January 2026, JTGROUP's order book stands at RM733M - representing over 3.7x FY2025 revenue (RM194.998M). This provides exceptional earnings visibility for a company of this size.
In March 2026, JTGROUP acquired a 51% stake in Roflex Pipe Sdn Bhd (cost: RM6.12M) - a polyethylene pipe manufacturer used in underground utility projects. This is a calculated vertical integration move - reducing dependency on external suppliers for key materials used in every underground cable installation.
ā SHARIAH-COMPLIANT - JTGROUP is classified as Shariah-compliant by Malaysia's Securities Commission (SC) Shariah Advisory Council. This means Islamic funds and investors who prioritize Shariah-compliant investments can hold this stock. (An earlier version wrongly labelled this non-compliant due to a data error.)
| Information | Details |
|---|---|
| Bursa Code | 0292 |
| Market | ACE Market, MYX |
| Sector | Construction (Infrastructure Utilities Engineering) |
| Listing Date | December 20, 2023 |
| IPO Price | RM0.27 |
| Current Price | ~RM0.59 (May 2026) |
| Market Cap | ~RM213.6M |
| Shariah Status | Shariah-Compliant |
| Dividends | None (0.00%) |
Get in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessThis section is being refreshed with the latest figures. Please check back soon.
This section is being refreshed with the latest figures. Please check back soon.
Get in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessGet in-depth analysis, target prices, and investment recommendations with Gold Members subscription.
How to Get Gold AccessInvestment theme reports featuring JATI TINGGI GROUP BERHAD
Malaysia's AI data centre boom has driven electricity demand up six-fold and ~RM42.8 billion of TNB grid capex. This report organises the GRID supply chain into 5 value-chain phases and identifies 19 Bursa Malaysia stocks, from macro power generation to internal power distribution in the server hall.
AI data centers are not about the building ā they are about the electricity flowing into them. This report maps 19 Bursa Malaysia stocks onto 5 phases of the data center grid supply chain, from TNB power generation upstream to critical power distribution at the server.